skip to main content

Case Study: Fire Damper Inspection and Maintenance Across Premier Inn and Beefeater Restaurants

Overview

BSML currently undertakes a comprehensive fire damper inspection and maintenance contract for Premier Inn and Beefeater restaurants, covering approximately 120 sites. The scope of work involves annual inspections, reporting, and performing remedial works to ensure compliance with fire safety regulations. With some of the larger sites housing up to 500 dampers, the project requires meticulous planning and execution to meet the client's safety standards while minimizing disruption to their operations.

Project Highlights

Scope of Inspections

  • Annual inspections of all fire dampers to ensure functionality and compliance.
  • Detailed reporting, highlighting issues such as damper malfunction, improper installation, or obstructions.
  • Recommendations for remedial works to address identified issues.

Remedial Works

  • Minor and major damper repairs, including realignment, cleaning, and replacing faulty components.
  • Replacement of non-compliant or damaged dampers.
  • Fire stopping services to ensure proper compartmentalization, certified by FIRAS.

Adaptability to Operational Challenges

  • Minimizing Disruption: Hotels and restaurants remain operational during inspections, necessitating flexible working schedules to avoid interfering with guests and diners.
  • Safety and Noise Management: Engineers adhered to strict safety protocols and employed low-noise tools and techniques to maintain a peaceful environment.
  • Efficient Access Coordination: Scheduled inspections and maintenance during off-peak hours and collaborated closely with site managers to prioritize areas with limited public access.

Skilled Workforce

  • Multi-skilled engineers with expertise in fire dampers and fire stopping ensured all aspects of fire safety were addressed in a single visit, saving time and costs for the client.
  • The team’s technical knowledge allowed immediate identification and resolution of issues, minimizing downtime for the client.

Challenges and Solutions

Large-Scale Sites

Challenge: Larger sites with up to 500 dampers posed logistical and time management challenges.

Solution: Dividing the inspection and maintenance tasks into manageable phases ensured thoroughness without compromising timelines.

Working in Public Spaces

Challenge: Hotels and restaurants often have high foot traffic, requiring a sensitive approach.

Solution: We used partitioning systems to isolate work areas and maintained clear communication with staff and guests to ensure a smooth experience.

Comprehensive Compliance

Challenge: Ensuring all dampers and compartment walls met the highest fire safety standards.

Solution: Our FIRAS-certified team employed industry-best practices for fire stopping and compartmentalization, ensuring complete compliance with legal requirements.

Results and Impact

  • Enhanced Fire Safety: The project ensured that all 120 sites met or exceeded fire safety standards, providing peace of mind to Premier Inn and Beefeater management and patrons.
  • Client Satisfaction: Our flexible, client-centric approach received positive feedback for minimal disruption and high-quality results.
  • Cost Efficiency: By employing a multi-skilled team, we reduced the need for multiple contractors, ensuring a seamless and cost-effective service.

Conclusion

This case study highlights our commitment to providing high-quality, adaptable fire safety services tailored to complex and sensitive environments like hotels and restaurants. Our comprehensive inspection and maintenance services, coupled with multi-skilled engineers and FIRAS certification, make us a trusted partner for ensuring fire safety compliance across large portfolios.

Get in touch with our team